Concurrent Crashing and Overlapping in Product Development
From MaRDI portal
Recommendations
- Overlapping design and build cycles in product development
- Optimal overlapping and functional interaction in product development
- A dynamic model for managing overlapped iterative product development
- Overlapping and communication policies in product development
- Optimal testing strategies in overlapped design process
Cited in
(16)- Overlapping and communication policies in product development
- Optimal overlapping and functional interaction in product development
- A mathematical model of a concurrent vehicle development system: estimating lead time
- Optimal supply diversification strategy under supply disruption
- Scheduling two projects with controllable processing times in a single-machine environment
- A dynamic model for managing overlapped iterative product development
- Monotonic robust optimal control policies for the time-quality trade-offs in concurrent new product development (NPD)
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Min-max regret version of the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- A Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph
- Regulation of overlaps in technology development activities
- Overlapping design and build cycles in product development
- The outsourcing conundrum: Misappropriation of intellectual property in supply chains
- A new project scheduling problem with worker-dependent durations
- Optimal testing strategies in overlapped design process
This page was built for publication: Concurrent Crashing and Overlapping in Product Development
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5321738)