Container sequencing for quay cranes with internal reshuffles
From MaRDI portal
Recommendations
- Dynamic programming algorithms for the general quay crane double-cycling problem with internal-reshuffles
- On double cycling for container port productivity improvement
- A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
- The quay crane scheduling problem with time windows
- The assignment of storage locations to containers for a container stack
Cites work
- scientific article; zbMATH DE number 2050708 (Why is no real title available?)
- scientific article; zbMATH DE number 2144389 (Why is no real title available?)
- A m‐parallel crane scheduling problem with a non‐crossing constraint
- A beam search algorithm for the load sequencing of outbound containers in port container terminals
- A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
- A crane scheduling method for port container terminals
- A fast heuristic for quay crane scheduling with interference constraints
- A heuristic rule for relocating blocks
- A mathematical formulation and complexity considerations for the blocks relocation problem
- A survey of berth allocation and quay crane scheduling problems in container terminals
- A tabu search heuristic for the quay crane scheduling problem
- Crane scheduling with non-crossing constraint
- Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks
- Operations research at container terminals: a literature update
- Optimal two- and three-stage production schedules with set-up time included
- Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
Cited in
(11)- Double girder bridge crane with double cycling: scheduling strategy and performance evaluation
- Scheduling small number of quay cranes with non-interference constraint
- A survey of berth allocation and quay crane scheduling problems in container terminals
- Loading, unloading and premarshalling of stacks in storage areas: survey and classification
- A tree search procedure for the container pre-marshalling problem
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
- On double cycling for container port productivity improvement
- Dynamic programming algorithms for the general quay crane double-cycling problem with internal-reshuffles
- A generalized classification scheme for crane scheduling with interference
- A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints
This page was built for publication: Container sequencing for quay cranes with internal reshuffles
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q989615)