Flow Shop Scheduling with Resource Flexibility
From MaRDI portal
Recommendations
- Scheduling Parallel Manufacturing Cells with Resource Flexibility
- Flow shop scheduling with partial resource flexibility
- Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
- Flexible job-shop scheduling problem under resource constraints
- Adaptive scheduling and tool flow control in flexible job shops
Cited in
(25)- Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound
- Multi-resource shop scheduling with resource flexibility
- A variant of the permutation flow shop model with variable processing times
- Single machine scheduling with discretely controllable processing times
- Flow shop scheduling with lot streaming
- A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages
- Two-machine open shop problem with controllable processing times
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem
- Optimization of the integrated problem of employee timetabling and job shop scheduling
- Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping
- Flow shop scheduling with partial resource flexibility
- Adaptive scheduling and tool flow control in flexible job shops
- The effect of process flexibility on productivity for classes of similar job shops
- Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop
- THE ASSIGNMENT OF INDIVIDUAL RENEWABLE RESOURCES IN SCHEDULING
- Cyclic job scheduling in paced assembly lines with cross-trained workers
- Flexible job-shop scheduling problem under resource constraints
- Flowshop with additional resources during setups: mathematical models and a GRASP algorithm
- A review and classification of scheduling objectives in unpaced flow shops for discrete manufacturing
- Flow shop scheduling with inter-stage flexibility and blocking constraints
- Optimal energy scheduling under time-of-use tariffs
- Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
- Solving an integrated job-shop problem with human resource constraints
- Process flexibility: design, evaluation, and applications
- Throughput optimization in two-machine flowshops with flexible operations
This page was built for publication: Flow Shop Scheduling with Resource Flexibility
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4305753)