Flow shop scheduling with partial resource flexibility
From MaRDI portal
Recommendations
- Flow Shop Scheduling with Resource Flexibility
- A tabu-search heuristic for the flexible-resource flow shop scheduling problem
- Scheduling Parallel Manufacturing Cells with Resource Flexibility
- Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
- Flexible job-shop scheduling problem under resource constraints
Cited in
(18)- Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound
- Multi-resource shop scheduling with resource flexibility
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers
- An optimal online algorithm for single-processor scheduling problem with learning effect
- Production, maintenance and resource scheduling: a review
- A semi-online algorithm and its competitive analysis for parallel-machine scheduling problem with rejection
- Optimization of the integrated problem of employee timetabling and job shop scheduling
- Cross-training workers in dual resource constrained systems with heterogeneous processing times
- Calibrating cross-training to meet demand mix variation and employee absence
- Flow Shop Scheduling with Resource Flexibility
- scientific article; zbMATH DE number 1910926 (Why is no real title available?)
- Online scheduling with deterioration and unexpected processor breakdown
- Flowshop with additional resources during setups: mathematical models and a GRASP algorithm
- A review and classification of scheduling objectives in unpaced flow shops for discrete manufacturing
- Flow shop scheduling with inter-stage flexibility and blocking constraints
- Multiskilled workforce staffing and scheduling: a logic-based Benders' decomposition approach
- Process flexibility: design, evaluation, and applications
- Throughput optimization in two-machine flowshops with flexible operations
This page was built for publication: Flow shop scheduling with partial resource flexibility
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3114898)