Improvability of assembly systems. I: Problem formulation and performance evaluation
Summary: This work develops improvability theory for assembly systems. It consists of two parts. Part I includes the problem formulation and the analysis technique. Part II (see the review below) presents the so-called improvability indicators and a case study. Improvability theory addresses the questions of improving performance in production systems with unreliable machines. We consider both constrained and unconstrained improvability. In the constrained case, the problem consists of determining if there exists a re-distribution of resources (inventory and workforce), which leads to an increase in the system's production rate. In the unconstrained case, the problem consists of identifying a machine and a buffer, which impede the system performance in the strongest manner. The investigation of the improvability properties requires an expression for the system performance measures as functions of the machine and buffer parameters. This paper presents a method for evaluating these functions and illustrates their practical utility using a case study at an automotive components plant. Part II uses the method developed here to establish conditions of improvability and to describe additional results of the case study.
- Improvable theory of assembly systems: Two component-one assembly machine case
- Improvability of assembly systems. II: Improvability indicators and case study
- scientific article; zbMATH DE number 912602
- Performance analysis of assembly systems with unreliable machines and finite buffers
- A system-theoretic property of serial production lines: improvability
- Improvable theory of assembly systems: Two component-one assembly machine case
- A framework for performance measurement during production ramp-up of assembly stations
- scientific article; zbMATH DE number 912602 (Why is no real title available?)
- Modelling and analysis of a multiple product manufacturing system with split and merge
- Improvability of assembly systems. II: Improvability indicators and case study
- Bernoulli serial production lines with quality control devices: theory and application
This page was built for publication: Improvability of assembly systems. I: Problem formulation and performance evaluation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5950079)