Improvability of assembly systems. II: Improvability indicators and case study
Summary: Based on the performance analysis technique developed in Part I this paper presents improvability indicators for assembly lines with unreliable machines. In particular, it shows that assembly lines are unimprovable with respect to workforce re-distribution if each buffer is, on the average, close to being half full. These lines are unimprovable with respect to buffer capacity re-distribution if each machine is starved and blocked with almost equal frequency. In addition, the paper provides indicators for identification of bottleneck machines and bottleneck buffers. Finally, the paper reports on an application of these improvability indicators in a case study at an automotive components plant.
- Improvability of assembly systems. I: Problem formulation and performance evaluation
- scientific article; zbMATH DE number 1094744
- scientific article; zbMATH DE number 912602
- Approximate models of assembly systems with finite inventory banks
- Improvable theory of assembly systems: Two component-one assembly machine case
- Improvable theory of assembly systems: Two component-one assembly machine case
- scientific article; zbMATH DE number 912602 (Why is no real title available?)
- Improvability of assembly systems. I: Problem formulation and performance evaluation
- Bernoulli serial production lines with quality control devices: theory and application
This page was built for publication: Improvability of assembly systems. II: Improvability indicators and case study
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5950080)