Instantaneous Power Peak Reduction and Train Scheduling Desynchronization in Subway Systems
From MaRDI portal
Recommendations
- Optimal velocity functions under energy regeneration
- Integrated optimization of train timetable, rolling stock assignment and short-turning strategy for a metro line
- Energy-efficient stochastic chance-constrained programming model for train timetable optimization
- Optimization using simulation and response surface methodology with an application on subway train scheduling
- A simple optimal solution to an energy regeneration model
Cited in
(4)
This page was built for publication: Instantaneous Power Peak Reduction and Train Scheduling Desynchronization in Subway Systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4233775)