Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair (Q1011913)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 5543070
Language Label Description Also known as
default for all languages
No label defined
    English
    Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair
    scientific article; zbMATH DE number 5543070

      Statements

      Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair (English)
      0 references
      0 references
      0 references
      0 references
      14 April 2009
      0 references
      Summary: This study uses a mathematical method to develop an efficient rule for expediting scrap-or-rework decision making in Economic Production Quantity (EPQ) model with failure-in-repair. The expected overall production-inventory costs and the optimal lot sizes for EPQ models with/without rework process are derived and compared. With straightforward numerical derivations, this paper develops an efficient rule including the exact critical value of unit repair cost for each reworked item and its approximation equations, to assist in determining whether it is beneficial to rework the repairable items. Numerical example with sensitivity analysis and discussion are provided to demonstrate their practical usages.
      0 references
      production
      0 references
      EPQ
      0 references
      scrap-or-rework
      0 references
      failure in repair random defective rate
      0 references

      Identifiers