Time optimal control of overhead cranes with hoisting of the load (Q1088960)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 4001981
Language Label Description Also known as
default for all languages
No label defined
    English
    Time optimal control of overhead cranes with hoisting of the load
    scientific article; zbMATH DE number 4001981

      Statements

      Time optimal control of overhead cranes with hoisting of the load (English)
      0 references
      0 references
      0 references
      0 references
      1987
      0 references
      The minimum time transfer of a load, suspended from a trolley by ropes, from an initial pint at rest to a terminal point where it is required to be at rest again, is investigated by controlling both the traversing motion of the trolley and the hoisting motion of the load. Special care is given to the modelling of the mechanical electrical features of the system. Mathematically, a boundary value problem with constraints both in the control and state variables is given. Necessary and sufficient conditions for time optimal solutions are derived using an extension of the Pontryagin maximum principle. The nonlinear control problem is solved analytically and a detailed discussion of the solutions is given. Numerical results are presented which apply to ship unloaders.
      0 references
      overhead crane
      0 references
      load hoisting
      0 references
      constraints
      0 references
      time optimal solutions
      0 references
      Pontryagin maximum principle
      0 references
      ship unloaders
      0 references

      Identifiers

      0 references
      0 references
      0 references
      0 references
      0 references
      0 references