Integration of production planning and scheduling based on RTN representation under uncertainties (Q2004899)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7257186
Language Label Description Also known as
default for all languages
No label defined
    English
    Integration of production planning and scheduling based on RTN representation under uncertainties
    scientific article; zbMATH DE number 7257186

      Statements

      Integration of production planning and scheduling based on RTN representation under uncertainties (English)
      0 references
      0 references
      0 references
      7 October 2020
      0 references
      Summary: Production planning and scheduling are important bases for production decisions. Concerning the traditional modeling of production planning and scheduling based on Resource-Task Network (RTN) representation, uncertain factors such as utilities are rarely considered as constraints. For the production planning and scheduling problem based on RTN representation in an uncertain environment, this paper formulates the multi-period bi-level integrated model of planning and scheduling, and introduces the uncertainties of demand and utility in planning and scheduling layers respectively. Rolling horizon optimization strategy is utilized to solve the bi-level integrated model iteratively. The simulation results show that the proposed model and algorithm are feasible and effective, can calculate the consumption of utility in every period, decrease the effects of uncertain factors on optimization results, more accurately describe the uncertain factors, and reflect the actual production process.
      0 references
      production planning and scheduling
      0 references
      RTN representation
      0 references
      integration model
      0 references
      uncertainties
      0 references

      Identifiers