Integration of production planning and scheduling based on RTN representation under uncertainties
Summary: Production planning and scheduling are important bases for production decisions. Concerning the traditional modeling of production planning and scheduling based on Resource-Task Network (RTN) representation, uncertain factors such as utilities are rarely considered as constraints. For the production planning and scheduling problem based on RTN representation in an uncertain environment, this paper formulates the multi-period bi-level integrated model of planning and scheduling, and introduces the uncertainties of demand and utility in planning and scheduling layers respectively. Rolling horizon optimization strategy is utilized to solve the bi-level integrated model iteratively. The simulation results show that the proposed model and algorithm are feasible and effective, can calculate the consumption of utility in every period, decrease the effects of uncertain factors on optimization results, more accurately describe the uncertain factors, and reflect the actual production process.
- scientific article; zbMATH DE number 5007553
- Solution strategy of integrated optimization of production planning and scheduling in a flexible job-shop
- An optimization algorithm for integrated remanufacturing production planning and scheduling system
- Modeling and Managing Uncertainty in Process Planning and Scheduling
- An uncertain programming for the integrated planning of production and transportation
- A robust optimization model for multi-site production planning problem in an uncertain environment
- An Integrated Model for Job-Shop Planning and Scheduling
- Capacity and material requirement planning modelling by comparing deterministic and fuzzy models
- Fuzzy hierarchical production planning (with a case study)
- Integrated production planning and scheduling of multi-stage workshop based on alternant iterative genetic algorithm
- Integrated versus hierarchical approach to aggregate production planning and master production scheduling
- Integration of process planning and scheduling -- a modified genetic algorithm-based approach
- Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates
- Solution strategy of integrated optimization of production planning and scheduling in a flexible job-shop
This page was built for publication: Integration of production planning and scheduling based on RTN representation under uncertainties
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2004899)