On the Gerber-Shiu function of a MAP risk model with possible delayed phase-type by-claims (Q2073498)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7468397
Language Label Description Also known as
default for all languages
No label defined
    English
    On the Gerber-Shiu function of a MAP risk model with possible delayed phase-type by-claims
    scientific article; zbMATH DE number 7468397

      Statements

      On the Gerber-Shiu function of a MAP risk model with possible delayed phase-type by-claims (English)
      0 references
      0 references
      0 references
      2 February 2022
      0 references
      Summary: This paper introduces the delayed claim settlement feature in a MAP risk model. Surplus process of the model incorporates two kinds of phase-type claims, the main claim and the by-claim. The delay feature is defined in such a way that every main claim may induce a by-claim with probability `\(\theta\)' and payment of the by-claim is delayed until the next claim arrival. An appropriate Gerber-Shiu function under an auxiliary (delayed) timeline is assumed to analyse the Gerber-Shiu function under the primary (original) timeline. Transient analysis of the Markovian fluid flow models is tailored to develop defective renewal equations satisfying Gerber-Shiu functions. An explicit solution for renewal equations is derived in terms of the Lundberg roots. Further, a Neumann series solution is also provided. A numerical example on the moment of surplus before ruin in a two-state model.
      0 references
      Gerber-Shiu function
      0 references
      MAP risk model
      0 references
      PH claims
      0 references
      delayed by-claims
      0 references
      system of Volterra integro-differential equation
      0 references
      matrix Lundberg equation
      0 references

      Identifiers