On the Gerber-Shiu function of a MAP risk model with possible delayed phase-type by-claims

From MaRDI portal
Publication:2073498





Summary: This paper introduces the delayed claim settlement feature in a MAP risk model. Surplus process of the model incorporates two kinds of phase-type claims, the main claim and the by-claim. The delay feature is defined in such a way that every main claim may induce a by-claim with probability `\(\theta\)' and payment of the by-claim is delayed until the next claim arrival. An appropriate Gerber-Shiu function under an auxiliary (delayed) timeline is assumed to analyse the Gerber-Shiu function under the primary (original) timeline. Transient analysis of the Markovian fluid flow models is tailored to develop defective renewal equations satisfying Gerber-Shiu functions. An explicit solution for renewal equations is derived in terms of the Lundberg roots. Further, a Neumann series solution is also provided. A numerical example on the moment of surplus before ruin in a two-state model.











This page was built for publication: On the Gerber-Shiu function of a MAP risk model with possible delayed phase-type by-claims

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2073498)