Optimisation of makespan of a flow shop problem using multi layer neural network (Q2224416)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7305625
Language Label Description Also known as
default for all languages
No label defined
    English
    Optimisation of makespan of a flow shop problem using multi layer neural network
    scientific article; zbMATH DE number 7305625

      Statements

      Optimisation of makespan of a flow shop problem using multi layer neural network (English)
      0 references
      0 references
      0 references
      3 February 2021
      0 references
      Summary: This paper presents an approach based on a multi layer neural network algorithm (MLNNA) to find a sequence of jobs for flow shop scheduling problems with the objective of minimise the makespan. The purpose of this paper is to develop an artificial intelligence and trained a neural network model for solving the flow shop scheduling problem which gives a best jobs sequence with the objective of minimise the makespan. The effectiveness of the proposed MLNNA method is compared with many problems selected from different papers. A large number of problems are solved with the present MLNNA model and it is found suitable and workable in all the cases.
      0 references
      artificial neural network
      0 references
      flow shop problem
      0 references
      scheduling
      0 references
      multi-layer network
      0 references
      makespan
      0 references
      job sequencing
      0 references

      Identifiers