Optimisation of makespan of a flow shop problem using multi layer neural network
Summary: This paper presents an approach based on a multi layer neural network algorithm (MLNNA) to find a sequence of jobs for flow shop scheduling problems with the objective of minimise the makespan. The purpose of this paper is to develop an artificial intelligence and trained a neural network model for solving the flow shop scheduling problem which gives a best jobs sequence with the objective of minimise the makespan. The effectiveness of the proposed MLNNA method is compared with many problems selected from different papers. A large number of problems are solved with the present MLNNA model and it is found suitable and workable in all the cases.
- A chaotic neural network algorithm for minimizing makespan in no-wait flow shop scheduling
- Job-shop scheduling using neural networks
- Advances in Neural Networks – ISNN 2005
- A neuro-tabu search heuristic for the flow shop scheduling problem
- A neural network approach to multiobjective and multilevel programming problems
- Optimization of manufacturing systems using a neural network metamodel with a new training approach
- Analysing the solution of production-inventory optimal control systems by neural networks
- Neural network models for solving the maximum flow problem
- scientific article; zbMATH DE number 1858052
This page was built for publication: Optimisation of makespan of a flow shop problem using multi layer neural network
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2224416)