Time series forecasting using a two-level multi-objective genetic algorithm: a case study of maintenance cost data for tunnel fans (Q2331650)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7124222
Language Label Description Also known as
default for all languages
No label defined
    English
    Time series forecasting using a two-level multi-objective genetic algorithm: a case study of maintenance cost data for tunnel fans
    scientific article; zbMATH DE number 7124222

      Statements

      Time series forecasting using a two-level multi-objective genetic algorithm: a case study of maintenance cost data for tunnel fans (English)
      0 references
      0 references
      0 references
      0 references
      0 references
      30 October 2019
      0 references
      Summary: The aim of this study has been to develop a novel two-level multi-objective genetic algorithm (GA) to optimize time series forecasting data for fans used in road tunnels by the Swedish Transport Administration (Trafikverket). Level 1 is for the process of forecasting time series cost data, while level 2 evaluates the forecasting. Level 1 implements either a multi-objective GA based on the ARIMA model or a multi-objective GA based on the dynamic regression model. Level 2 utilises a multi-objective GA based on different forecasting error rates to identify a proper forecasting. Our method is compared with using the ARIMA model only. The results show the drawbacks of time series forecasting using only the ARIMA model. In addition, the results of the two-level model show the drawbacks of forecasting using a multi-objective GA based on the dynamic regression model. A multi-objective GA based on the ARIMA model produces better forecasting results. In level 2, five forecasting accuracy functions help in selecting the best forecasting. Selecting a proper methodology for forecasting is based on the averages of the forecasted data, the historical data, the actual data and the polynomial trends. The forecasted data can be used for life cycle cost (LCC) analysis.
      0 references
      ARIMA model
      0 references
      data forecasting
      0 references
      multi-objective genetic algorithm
      0 references
      regression model
      0 references
      0 references
      0 references

      Identifiers

      0 references
      0 references
      0 references
      0 references
      0 references
      0 references
      0 references