| Publication | Date of Publication | Type |
|---|
Simulative assessment of patrol car allocation and response time European Journal of Operational Research | 2025-05-20 | Paper |
Police service district planning OR Spectrum | 2025-01-21 | Paper |
| The lot-size adaptation approach for the two-level stochastic capacitated lot-sizing problem | 2024-09-17 | Paper |
A pilgrim scheduling approach to increase safety during the Hajj Operations Research | 2020-10-20 | Paper |
On the product portfolio planning problem with customer-engineering interaction Operations Research Letters | 2018-10-02 | Paper |
Urban public transit network optimization with flexible demand OR Spectrum | 2015-03-12 | Paper |
Insights into clients' choice in preventive health care facility location planning OR Spectrum | 2015-03-12 | Paper |
A comparison of linear reformulations for multinomial logit choice probabilities in facility location models European Journal of Operational Research | 2015-02-18 | Paper |
Upper and lower bounds for the sales force deployment problem with explicit contiguity constraints European Journal of Operational Research | 2015-02-04 | Paper |
Fast Approximation Methods for Sales Force Deployment Management Science | 2012-02-12 | Paper |
Vehicle and crew scheduling with flexible timetable Operations Research Proceedings | 2011-04-07 | Paper |
Simultaneous Vehicle and Crew Scheduling with Trip Shifting Operations Research Proceedings | 2011-04-07 | Paper |
Line Optimization in Public Transport Systems Operations Research Proceedings | 2011-04-07 | Paper |
Duty-period-based network model for crew rescheduling in European airlines Journal of Scheduling | 2007-05-15 | Paper |
The customer assignment and traveling salespersons problem OR Spektrum | 2002-08-01 | Paper |
| The optimal design of a dealership network for a car manufacturer | 2001-11-26 | Paper |
Simultaneous Vehicle and Crew Scheduling in Urban Mass Transit Systems Transportation Science | 2001-01-01 | Paper |
| An exact branch and cut algorithm for the vehicle and crew scheduling problem | 2000-02-01 | Paper |
Experience with fine-grained parallel genetic algorithms Annals of Operations Research | 1999-12-02 | Paper |
The course scheduling problem at Lufthansa technical training European Journal of Operational Research | 1999-09-16 | Paper |
LINGO OR Spektrum | 1998-08-25 | Paper |
Profit margin oriented course scheduling at Lufthansa Technical Training Ltd. OR Spektrum | 1998-08-10 | Paper |
Profit margin oriented course scheduling at Lufthansa Technical Training Ltd. OR Spektrum | 1998-08-10 | Paper |
Capacitated lot-sizing with sequence dependent setup costs OR Spektrum | 1996-08-19 | Paper |
Sequential-analysis Based Randomized-regret-methods for Lot-sizing and Scheduling The Journal of the Operational Research Society | 1996-08-05 | Paper |
Lotsizing and scheduling for production planning Lecture Notes in Economics and Mathematical Systems | 1994-06-29 | Paper |