Modelling complex assemblies as a queueing network for lead time control
From MaRDI portal
Recommendations
- Multi-objective lead time control in multistage assembly systems
- A multi-objective lead time control problem in multistage assembly systems using an interactive method
- Due date assignment for multistage assembly systems
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
- Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times
Cites work
- A Markovian single server with upstream job and downstream demand arrival stream
- Approximations for the time spent in a dynamic job shop with applications to due-date assignment
- Assembly-like queues
- Assembly-like queues with finite capacity: Bounds, asymptotics and approximations
- Critical Path Analyses Via Chance Constrained and Stochastic Programming
- Decentralized control of service rates in a closed Jackson network
- Distribution of the Time Through a Directed, Acyclic Network
- Due Date Assignment for Production Systems
- Graph theory with applications
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- Multi-objective routing within large scale facilities using open finite queueing networks
- Optimal Control of Arrivals to Token Ring Networks with Exhaustive Service Discipline
- Optimal control of service rates and arrivals in Jackson networks
- Performance analysis and buffer allocations in some open assembly systems.
- Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
- Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
- Steady state waiting time in a multicenter job shop
- Survey of scheduling research involving due date determination decisions
Cited in
(13)- A multi-objective lead time control problem in multistage assembly systems using an interactive method
- A MAINTENANCE MODEL FOR MANUFACTURING LEAD TIME IN A PRODUCTION SYSTEM WITH BMAP INPUT AND BILEVEL SETUP CONTROL
- Longest path analysis in networks of queues: dynamic scheduling problems
- Multi-objective lead time control in multistage assembly systems
- Due-date assignment for multi-server multi-stage assembly systems
- Part sojourn time distribution in a two-machine line
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
- Due date assignment for multistage assembly systems
- PERFORMANCE EVALUATION OF OPEN QUEUEING NETWORKS WITH FUZZY PARAMETERS
- A change point control chart for monitoring the production lead time based on sum of squared ranks
- Design and optimization of multi-echelon assembly networks: Savings and potentialities
- Approximate decomposition methods for the analysis of multicommodity flow routing in generalized queuing networks
- Queueing network modelling and lead time compression of pharmaceutical drug development
This page was built for publication: Modelling complex assemblies as a queueing network for lead time control
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q858340)