Note—On Baluts Algorithm and NP-Completeness for a Chance-Constrained Scheduling Problem
From MaRDI portal
Cited in
(15)- Minimizing the expected weighted number of tardy jobs in stochastic flow shops
- On the minimization of the weighted number of tardy jobs with random processing times and deadline
- The stochastic single machine scheduling problem with earliness and tardiness costs
- General stochastic single-machine scheduling with regular cost functions
- Dynamic scheduling of stochastic jobs on a single machine
- Minimizing the expected number of tardy jobs when processing times are normally distributed
- Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
- A polynomial time algorithm for a chance-constrained single machine scheduling problem
- Optimal sequences in stochastic single machine shops
- Minimizing earliness and tardiness costs in stochastic scheduling
- Setting optimal due dates in a basic safe-scheduling model
- A survey of single machine scheduling to minimize weighted number of tardy jobs
- Single Machine Stochastic Scheduling: Minimizing the Number of Tardy Jobs
- Minimizing the number of tardy jobs with stochastically-ordered processing times
- Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem
This page was built for publication: Note—On Baluts Algorithm and NP-Completeness for a Chance-Constrained Scheduling Problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3659513)