Optimal Leadtimes Planning in a Serial Production System
From MaRDI portal
Recommendations
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- On the leadtime effect of two-stages production planning with random point demand
- Setting optimal planned leadtimes in configure-to-order assembly systems
- Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates
Cited in
(15)- Production planning with load dependent lead times: An update of research
- Stochastic leadtimes in two-level distribution-type networks
- Reducing the cost of defects in multistage production systems: A budget allocation perspective
- Measurement and optimization of responsiveness in supply chain networks with queueing structures
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Planning order release dates for multilevel linear supply chain with random lead times
- A robust policy for serial agile production systems
- Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates
- Product recovery in stochastic remanufacturing systems with multiple reuse options
- Optimizing delivery lead time/inventory placement in a two-stage production/distribution system
- Optimal control of a divergent multi-echelon inventory system
- Newsvendor equations for production networks
- An ordinal optimization based evolution strategy to schedule complex make-to-order products
- Setting optimal planned leadtimes in configure-to-order assembly systems
- Production planning with load dependent lead times
This page was built for publication: Optimal Leadtimes Planning in a Serial Production System
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4302667)