Optimization of production planning problem with continuously distributed time-lags

From MaRDI portal





The formulation of a well-known production and inventory problem is extended to consider gradual reduction of the utility or potential of the produced item with the passage of time. The effect of decay on the inventory level is expressed with the concept of a continuously distributed time-lag. The demand rate being given, the problem consists in determining the production rate of the decaying item so as to minimize the current value of a quadratic performance criterion. The performance criterion is the sum of production cost, inventory holding cost, and two quadratic terms penalizing deviations of state and control trajectories from desired trajectories. Application of continuous optimal control theory leads to a two-point-boundary-value-problem (TPBVP) which represents necessary and sufficient optimality conditions for the original problem. A particular iterative algorithm is proposed for the solution of the TPBVP along with a convergence proof. After an illustrative example, some special cases like the steady-state solution and the properties of the optimal solution for the case of a constant rate of decay are discussed.











This page was built for publication: Optimization of production planning problem with continuously distributed time-lags

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3758547)