Joanna Józefowska

From MaRDI portal
Person:213364

Available identifiers

zbMath Open jozefowska.joannaMaRDI QIDQ213364

List of research outcomes





PublicationDate of PublicationType
Just-in-Time Scheduling in Modern Mass Production Environment2017-02-03Paper
https://portal.mardi4nfdi.de/entity/Q55008452015-08-10Paper
Project scheduling with finite or infinite number of activity processing modes -- a survey2011-01-28Paper
Heuristic procedures for allocating the continuous resource in discrete-continuous scheduling problems2011-01-28Paper
Probabilistic tabu search for makespan minimization discrete-continuous scheduling2011-01-28Paper
https://portal.mardi4nfdi.de/entity/Q30708512011-01-28Paper
The role of semantics in mining frequent patterns from knowledge bases in description logics with rules2010-07-23Paper
Apportionment methods and the Liu-Layland problem2008-11-18Paper
Just-in-time scheduling. Models and algorithms for computer and manufacturing systems2007-09-07Paper
https://portal.mardi4nfdi.de/entity/Q52973902007-07-18Paper
Minimizing the earliness--tardiness costs on a single machine2006-08-14Paper
An almost optimal heuristic for preemptive \(C_{\text{max}}\) scheduling of dependent tasks on parallel identical machines2004-08-10Paper
Solving the discrete-continuous project scheduling problem via its discretization2003-08-18Paper
A heuristic approach to allocating the continuous resource in discrete--continuous scheduling problems to minimize the makespan2003-02-23Paper
Tabu list management methods for a discrete-continuous scheduling problem2002-06-16Paper
Simulated annealing for multi-mode resource-constrained project scheduling2001-10-31Paper
Local search metaheuristics for discrete-continuous scheduling problems1999-09-13Paper
On a methodology for discrete-continuous scheduling1999-07-11Paper
Discrete-continuous scheduling to minimize the makespan for power processing rates of jobs1999-06-28Paper
https://portal.mardi4nfdi.de/entity/Q42408681999-05-26Paper
Discrete-continuous scheduling problems -- mean completion time results1999-02-22Paper
https://portal.mardi4nfdi.de/entity/Q43522331998-02-19Paper
5th international workshop on project management and scheduling. Poznań, Poland, April 11--13, 19961998-01-01Paper
Minimization of mean flow time for some discrete-continuous scheduling problems1997-09-29Paper
Algorithms for minclique scheduling problems1997-02-25Paper
https://portal.mardi4nfdi.de/entity/Q44334431996-01-01Paper
Scheduling shops to minimize the weighted number of late jobs1995-05-28Paper
Approximation algorithms for some discrete-continuous scheduling problems1994-08-29Paper
https://portal.mardi4nfdi.de/entity/Q57507041990-01-01Paper

Research outcomes over time

This page was built for person: Joanna Józefowska