Nengmin Wang

From MaRDI portal
Person:319208

Available identifiers

zbMath Open wang.nengminMaRDI QIDQ319208

List of research outcomes





PublicationDate of PublicationType
A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective2024-07-08Paper
Hybrid heuristic for the location‐inventory‐routing problem in closed‐loop supply chain2023-11-21Paper
Tabu search for proactive project scheduling problem with flexible resources2023-07-04Paper
Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem2023-07-04Paper
A benders decomposition algorithm for a bid generation problem in the procurement of three-echelon transportation services2023-07-03Paper
Multimode time-cost-robustness trade-off project scheduling problem under uncertainty2022-07-18Paper
Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap2021-11-23Paper
https://portal.mardi4nfdi.de/entity/Q49962882021-07-01Paper
Shipper collaboration in forward and reverse logistics2020-07-16Paper
A location-inventory-routing problem in forward and reverse logistics network design2019-02-20Paper
Integrated inventory routing problem with quality time windows and loading cost for deteriorating items under discrete time2019-02-08Paper
An effective hybrid approach to the two-stage capacitated facility location problem2019-01-28Paper
Reverse revenue sharing contract versus two-part tariff contract under a closed-loop supply chain system2018-10-12Paper
Line-of-credit payment scheme and its impact on the retailer's ordering policy with inventory-level-dependent demand2018-10-12Paper
Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap2018-07-11Paper
Analysis of the bullwhip effect in two parallel supply chains with interacting price-sensitive demands2016-10-06Paper
Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective2014-09-26Paper
Design of a multiobjective reverse logistics network considering the cost and service level2013-06-11Paper
Simulated annealing and tabu search for multi-mode project payment scheduling2009-12-07Paper
https://portal.mardi4nfdi.de/entity/Q35383182008-11-24Paper

Research outcomes over time

This page was built for person: Nengmin Wang