Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective
From MaRDI portal
Publication:744648
DOI10.1007/s10479-012-1155-9zbMath1296.90050OpenAlexW2056277346MaRDI QIDQ744648
Nengmin Wang, Zhengwen He, Peng-Xiang Li
Publication date: 26 September 2014
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-012-1155-9
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models ⋮ A reduction tree approach for the discrete time/cost trade-off problem ⋮ An agent-based negotiation model on price and delivery date in a fashion supply chain ⋮ Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap ⋮ Capital- and resource-constrained project scheduling with net present value optimization ⋮ LFM signal parameters estimation using optimization approach initialized by Lipschitz constant assisted DIRECT algorithm
Uses Software
Cites Work
- Optimization by Simulated Annealing
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Thermodynamical approach to the travelling salesman problem: An efficient simulation algorithm
- Simulated annealing: A tool for operational research
- Tabu search for discrete-continuous scheduling problems with heuristic continuous resource allocation
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Simulated annealing and tabu search for multi-mode project payment scheduling
- The discrete time-cost tradeoff problem revisited
- Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm
- Project network models with discounted cash flows a guided tour through recent developments
- Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows
- PSPLIB -- a project scheduling problem library
- Interactive analysis of multiple-criteria project scheduling problems
- An exact algorithm for project scheduling with multiple modes
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Project scheduling. A research handbook.
- An equitable approach to the payment scheduling problem in project management
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Using metaheuristics in multiobjective resource constrained project scheduling
- Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach
- Multi-mode project payment scheduling problems with bonus-penalty structure
- Project Contracts and Payment Schedules: The Client's Problem
- The Impact of Contractor Behavior on the Client’s Payment-Scheduling Problem
- Client‐contractor bargaining on net present value in project scheduling with limited resources
- Simulated Annealing – An Annotated Bibliography
- Resource-constrained project scheduling by simulated annealing
- A simulated annealing algorithm for resource constrained project scheduling problems
- On modelling payments in projects
- Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks
- Cash Flows in Networks
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Handbook on Scheduling
- Simulated annealing for multi-mode resource-constrained project scheduling
- A two stage search heuristic for scheduling payments in projects
This page was built for publication: Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective