| Publication | Date of Publication | Type |
|---|
| An extended ϵ‐constraint method for a multiobjective finite‐horizon Markov decision process | 2023-11-29 | Paper |
| A discrete-time approximation technique for the time-cost trade-off in PERT networks | 2018-01-12 | Paper |
| Resource allocation in multi-class dynamic PERT networks with finite capacity | 2016-10-06 | Paper |
| Resource allocation in dynamic PERT networks with finite capacity | 2012-05-23 | Paper |
| Interactive Multi-Objective Stochastic Programming Approaches for Designing Robust Supply Chain Networks | 2011-04-07 | Paper |
| A branch-and-bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine | 2010-11-12 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3401786 | 2010-02-01 | Paper |
| An extension of the relaxation algorithm for solving a special case of capacitated arc routing problems | 2009-09-18 | Paper |
| Due date assignment for multistage assembly systems | 2009-06-17 | Paper |
| Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm | 2008-12-17 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3540665 | 2008-11-24 | Paper |
| A multi-objective resource allocation problem in dynamic PERT networks | 2008-09-12 | Paper |
| Time-cost trade-off via optimal control theory in Markov PERT networks | 2008-03-31 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5431790 | 2008-01-02 | Paper |
| Lower bound for the mean project completion time in dynamic PERT networks | 2007-11-23 | Paper |
| A multi-objective discrete reliability optimization problem for dissimilar-unit standby systems | 2007-11-14 | Paper |
| Multi-objective lead time control in multistage assembly systems | 2007-10-26 | Paper |
| Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach | 2007-03-27 | Paper |
| A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms | 2007-02-26 | Paper |
| Modelling complex assemblies as a queueing network for lead time control | 2007-01-09 | Paper |
| Bicriteria shortest path in networks of queues | 2007-01-09 | Paper |
| Longest path analysis in networks of queues: dynamic scheduling problems | 2007-01-09 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3410352 | 2006-11-27 | Paper |
| A multi-objective lead time control problem in multistage assembly systems using an interactive method | 2006-06-30 | Paper |
| A multi-objective resource allocation problem in PERT networks | 2006-05-16 | Paper |
| Reliability evaluation of multi-component cold-standby redundant systems | 2006-05-16 | Paper |
| A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert | 2006-04-28 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5719001 | 2006-01-16 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5718968 | 2006-01-16 | Paper |
| Solving a dynamic cell formation problem using metaheuristics | 2005-11-22 | Paper |
| A hybrid method for solving stochastic job shop scheduling problems | 2005-11-14 | Paper |
| A genetic algorithm approach for the time-cost trade-off in PERT networks | 2005-11-04 | Paper |
| Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert | 2005-10-28 | Paper |
| Reliability function of a class of time-dependent systems with standby redundancy | 2005-09-02 | Paper |
| RELIABILITY EVALUATION AND OPTIMIZATION OF DISSIMILAR-COMPONENT COLD-STANDBY REDUNDANT SYSTEMS | 2005-08-17 | Paper |
| Distribution function of the shortest path in networks of queues | 2005-02-24 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3044289 | 2004-08-10 | Paper |
| Dynamic shortest path in stochastic dynamic networks: Ship routing problem | 2003-04-28 | Paper |
| Optimal control of service rates and arrivals in Jackson networks | 2003-04-10 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3149925 | 2003-03-12 | Paper |