Polynomially solvable subcases for the approximate solution of multi-machine scheduling problems | 2024-04-03 | Paper |
Minimizing the total weighted duration of courses in a single machine problem with precedence constraints | 2024-01-11 | Paper |
Application of the interpolation approach for approximating single-machine scheduling problem with an unknown objective function | 2023-08-10 | Paper |
Metric interpolation for the problem of minimizing the maximum lateness for a single machine | 2022-01-21 | Paper |
Optimization of a recursive conveyor by reduction to a constraint satisfaction problem | 2022-01-21 | Paper |
A metric approach for scheduling problems with minimizing the maximum penalty | 2021-11-15 | Paper |
A problem of scheduling operations at a locomotive maintenance depot | 2021-09-14 | Paper |
Metric approach for finding approximate solutions of scheduling problems | 2021-08-24 | Paper |
Minimization of the weighted total sparsity of cosmonaut training courses | 2021-05-18 | Paper |
Minimizing total weighted tardiness for scheduling equal-length jobs on a single machine | 2021-01-14 | Paper |
Rescheduling traffic on a partially blocked segment of railway with a siding | 2021-01-14 | Paper |
Evaluating typical algorithms of combinatorial optimization to solve continuous-time based scheduling problem | 2019-10-29 | Paper |
An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the resource constrained project scheduling problem | 2019-01-18 | Paper |
Estimation of the absolute error and polynomial solvability for a classical NP-hard scheduling problem | 2018-09-13 | Paper |
Scheduling the two-way traffic on a single-track railway with a siding | 2018-06-26 | Paper |
A metric for total tardiness minimization | 2017-07-07 | Paper |
Scheduling jobs with equal processing times on a single machine: minimizing maximum lateness and makespan | 2017-06-29 | Paper |
Minimizing the maximal weighted lateness of delivering orders between two railroad stations | 2017-03-23 | Paper |
Two-directional traffic scheduling problem solution for a single-track railway with siding | 2017-03-23 | Paper |
A new effective dynamic program for an investment optimization problem | 2017-01-20 | Paper |
Minimization of the maximal lateness for a single machine | 2016-10-21 | Paper |
Algorithms for solving the NP-hard problem of minimizing total tardiness for a single machine | 2015-08-20 | Paper |
A graphical approach to solve an investment optimization problem | 2014-12-16 | Paper |
Approximability results for the resource-constrained project scheduling problem with a single type of resources | 2014-09-26 | Paper |
The problem of trains formation and scheduling: integer statements | 2014-03-24 | Paper |
https://portal.mardi4nfdi.de/entity/Q5397844 | 2014-02-24 | Paper |
Single machine total tardiness maximization problems: complexity and algorithms | 2013-09-16 | Paper |
Decomposition algorithm to minimize total tardiness | 2013-06-04 | Paper |
The Pareto-optimal set of the NP-hard problem of minimization of the maximum lateness for a single machine | 2013-05-24 | Paper |
A note on the paper `Single machine scheduling problems with financial resource constraints: some complexity results and properties' by E.R. Gafarov et al. | 2013-05-10 | Paper |
A special case of the single-machine total tardiness problem is NP-hard | 2013-04-12 | Paper |
Transformation of the network graph of scheduling problems with precedence constraints to a planar graph | 2012-11-15 | Paper |
Transforming a pseudo-polynomial algorithm for the single machine total tardiness maximization problem into a polynomial one | 2012-11-15 | Paper |
A note on a single machine scheduling problem with generalized total tardiness objective function | 2012-03-09 | Paper |
A scheme of approximation solution of problem 1 |r j|L max | 2012-02-10 | Paper |
Single machine scheduling problems with financial resource constraints: some complexity results and properties | 2011-08-04 | Paper |
Foreword to the thematical issue devoted to the seventieth anniversary of Academician V. S. Tanaev | 2011-01-03 | Paper |
Algorithms for some maximization scheduling problems on a single machine | 2011-01-03 | Paper |
Properties of optimal schedules for the minimization total weighted completion time in preemptive equal-length job with release dates scheduling problem on a single machine | 2011-01-03 | Paper |
Metrics in scheduling problems | 2010-12-08 | Paper |
A graphical realization of the dynamic programming method for solving NP-hard combinatorial problems | 2010-06-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q3652469 | 2009-12-17 | Paper |
Algorithms for special cases of the single machine total tardiness problem and an application to the even-odd partition problem | 2009-10-12 | Paper |
On project scheduling problem | 2009-02-26 | Paper |
Estimation of absolute error in scheduling problems of minimizing the maximum lateness | 2009-01-19 | Paper |
A hybrid algorithm for the single-machine total tardiness problem | 2008-11-07 | Paper |
Solution of the NP-hard total tardiness minimization problem in scheduling theory | 2008-01-22 | Paper |
Graphical approach to combinatorial optimization | 2007-07-05 | Paper |
https://portal.mardi4nfdi.de/entity/Q4820219 | 2004-10-06 | Paper |
Dual of the maximum cost minimization problem | 1989-01-01 | Paper |
Scheduling algorithms based on necessary optimality conditions | 1989-01-01 | Paper |
Analysis of scheduling problems using transformations | 1989-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3735431 | 1984-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3735432 | 1984-01-01 | Paper |