Scheduling with batching: Minimizing the weighted number of tardy jobs

From MaRDI portal
Publication:1342278

DOI10.1016/0167-6377(94)90063-9zbMath0820.90052OpenAlexW2014889423MaRDI QIDQ1342278

Dan Landy, Dorit S. Hochbaum

Publication date: 11 January 1995

Published in: Operations Research Letters (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0167-6377(94)90063-9



Related Items

One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objectiveMinimizing total weighted tardiness on a single batch process machine with incompatible job familiesA branch and bound algorithm to minimize the total weighed number of tardy jobs and delivery costsA survey of single machine scheduling to minimize weighted number of tardy jobsSingle machine batch scheduling with deadlines and resource dependent processing timesSingle machine batch scheduling with non-increasing time slot costsTwo-agent scheduling with agent specific batches on an unbounded serial batching machineBatch machine production with perishability time windows and limited batch sizeScheduling with batching: A reviewScheduling with centralized and decentralized batching policies in concurrent open shopsForming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problemFamily scheduling with batch availability in flow shops to minimize makespanSingle machine scheduling with deadlines, release and due datesScheduling batches with simultaneous job processing for two-machine shop problemsPseudo-polynomial dynamic programming for an integrated due date assignment, resource allocation, production, and distribution scheduling model in supply chain schedulingMaximization of solution flexibility for robust shop schedulingApproximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chainsOptimal delivery time quotation in supply chains to minimize tardiness and delivery costsSingle machine batch scheduling with resource dependent setup and processing timesScheduling with batching: Two job typesParallel machine batching and scheduling with deadlinesScheduling on a batch processing machine with split compatibility graphsMinimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains



Cites Work