Job shop scheduling with separable sequence-dependent setups
From MaRDI portal
Publication:1374429
DOI10.1023/A:1018918003761zbMATH Open0890.90094OpenAlexW166042286MaRDI QIDQ1374429FDOQ1374429
Authors: In-Chan Choi, Osman Korkmaz
Publication date: 4 December 1997
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1018918003761
Recommendations
- Sequence-dependent setup times in a two-machine job-shop with minimizing the schedule length
- Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times
- Job shop scheduling with setup times, deadlines and precedence constraints
- scientific article; zbMATH DE number 1301841
- Solving the flexible job shop scheduling problem with sequence-dependent setup times
Cited In (18)
- A worker constrained flexible job shop scheduling problem with sequence-dependent setup times
- Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times
- Title not available (Why is that?)
- A divide and merge heuristic for the multiprocessor scheduling problem with sequence dependent setup times
- Sequence-dependent setup times in a two-machine job-shop with minimizing the schedule length
- A neighborhood search function for flexible job shop scheduling with separable sequence-dependent setup times
- Title not available (Why is that?)
- An advanced scatter search algorithm for solving job shops with sequence dependent and non-anticipatory setups
- Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems
- Optimization of setup times in the furniture industry
- Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times
- A beam search heuristic for scheduling a single machine with release dates and sequence dependent setup times to minimize the makespan
- A scheduling problem in a semi-open job shop -- the case of a cordset manufacturing company
- A branch and bound method for the job-shop problem with sequence-dependent setup times
- A genetic algorithm with a mixed region search for the asymmetric traveling salesman problem
- Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times
- Scheduling job shop problems with sequence-dependent setup times
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis
This page was built for publication: Job shop scheduling with separable sequence-dependent setups
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1374429)