Product warranty logistics: issues and challenges.
From MaRDI portal
Publication:1426695
DOI10.1016/S0377-2217(02)00912-8zbMath1045.90024OpenAlexW2166491756MaRDI QIDQ1426695
T. Roren, O. Solem, D. N. Prabhakar Murthy
Publication date: 15 March 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(02)00912-8
Management decision making, including multiple objectives (90B50) Transportation, logistics and supply chain management (90B06) Production models (90B30)
Related Items (16)
Expert elicitation for reliable system design. (With comments and rejoinder) ⋮ Optimal payment scheme when the supplier's quality level and cost are unknown ⋮ TWO NEW SERVICING STRATEGIES FOR PRODUCTS SOLD WITH WARRANTY ⋮ Warranty cost analysis for products with a dormant state ⋮ Warranty cost analysis for nonrepairable services products ⋮ Game theoretic analysis of after-sales service in two-echelon supply chain with warranty sensitive demand ⋮ Optimizing reliability and service parts logistics for a time-varying installed base ⋮ Optimal price, warranty length and production rate for the dynamic sales market ⋮ Probabilistic and cost analyses of a renewable warranty with an inspection policy for a discrete operating item from a heterogeneous population ⋮ Bi-objective optimization of a multi-product multi-period three-echelon supply chain problem under uncertain environments: NSGA-II and NRGA ⋮ A hybrid approach for joint optimization of base and extended warranty decisions considering out-of-warranty products ⋮ Optimal maintenance service contract negotiation with aging equipment ⋮ Optimization of component reliability in the design phase of capital goods ⋮ An efficient model formulation for level of repair analysis ⋮ Extended warranty pricing considering the time of money ⋮ Maintenance models in warranty: a literature review
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Repair-replace strategies for two-dimensional warranty policies
- Product warranty management. I: A taxonomy for warranty policies
- Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities
- The principal/agent paradigm: Its relevance to various functional fields
- A service logistics model for simultaneous siting of facilities and multiple levels of equipment
- Replacement-repair policy for multi-state deteriorating products under warranty
- Strategic facility location: A review
- Integrated production/distribution planning in supply chains: An invited review
- An integrated inventory-transportation system with modified periodic policy for multiple products
- Feature issue: A global view of industrial logistics
- A combinatorial approach to level of repair analysis
- Selective maintenance for support equipment involving multiple maintenance actions
- A continuous model for production-distribution system design
- Heuristics for assessing emergency transshipments
- Inventory, transportation, service quality and the location of distribution centers
- Optimal inventory modeling of systems. Multi-echelon techniques
- A new repair-replace strategy for items sold with a two-dimensional warranty
- A Polynomial Time Approximation Scheme for General Multiprocessor Job Scheduling
- Optimum Preventive Maintenance Policies
- The complexity of the travelling repairman problem
- A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System
- Aggregate planning models for field service delivery
- A servicing strategy for items sold under warranty
This page was built for publication: Product warranty logistics: issues and challenges.