Optimizing reliability and service parts logistics for a time-varying installed base
From MaRDI portal
Publication:439471
DOI10.1016/j.ejor.2011.10.026zbMath1244.90076OpenAlexW2019913202MaRDI QIDQ439471
Publication date: 16 August 2012
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2011.10.026
reliabilitynon-stationary demandlife cycle cost analysisperformance based logisticsrepairable inventory
Transportation, logistics and supply chain management (90B06) Reliability, availability, maintenance, inspection in operations research (90B25) Inventory, storage, reservoirs (90B05)
Related Items (11)
The effects of asset specificity on maintenance financial performance: an empirical application of transaction cost theory to the medical device maintenance field ⋮ Service supply chain management: a review of operational models ⋮ Optimal warranty policies considering repair service and replacement service under the manufacturer's perspective ⋮ Traditional or additive manufacturing? Assessing component design options through lifecycle cost analysis ⋮ Pricing of full-service repair contracts ⋮ Optimal redesign decisions through failure rate estimates ⋮ A risk-averse stochastic program for integrated system design and preventive maintenance planning ⋮ OR in spare parts management: a review ⋮ Maximizing system availability through joint decision on component redundancy and spares inventory ⋮ Contract design for equipment after-sales service with business interruption insurance ⋮ Simulation research of space-time evolution of emergency logistics network reliability based on complex network theory
Cites Work
- Unnamed Item
- Optimization of component reliability in the design phase of capital goods
- A production-inventory model in an imperfect production process
- On the computational complexity of reliability redundancy allocation in a series system
- Models for multi-echelon repairable item inventory systems with limited repair capacity
- Product warranty logistics: issues and challenges.
- Performance Contracting in After-Sales Service Supply Chains
- On the solution of renewal-type integral equations
- Spares provisioning under performance-based logistics contract: profit-centric approach
- Weibull and Gamma Renewal Approximation Using Generalized Exponential Functions
- Branch and Bound Experiments in Convex Nonlinear Integer Programming
- A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment
- Analysis and Algorithms for Service Parts Supply Chains
This page was built for publication: Optimizing reliability and service parts logistics for a time-varying installed base