Maximizing system availability through joint decision on component redundancy and spares inventory
DOI10.1016/j.ejor.2014.02.031zbMath1304.90077OpenAlexW1999761865MaRDI QIDQ2514822
Tongdan Jin, Haitao Liao, Wei Xie
Publication date: 4 February 2015
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2014.02.031
redundancy allocationperformance-based contractingoperational availabilityrepairable \(k\)-out-of-\(n:G\) systemspare parts logistics
Transportation, logistics and supply chain management (90B06) Reliability, availability, maintenance, inspection in operations research (90B25) Inventory, storage, reservoirs (90B05)
Related Items
Cites Work
- Unnamed Item
- Optimizing reliability and service parts logistics for a time-varying installed base
- On the interaction between maintenance, spare part inventories and repair capacity for a \(k\)-out-of-\(N\) system with wear-out
- Optimization of component reliability in the design phase of capital goods
- On the computational complexity of reliability redundancy allocation in a series system
- Repairable inventory theory: Models and applications
- Reliability redundancy allocation: an improved realization for nonconvex nonlinear programming problems
- Performance Contracting in After-Sales Service Supply Chains
- A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment
- A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System
- Redundancy Optimization for Critical Components in High-Availability Technical Systems
- Computing small-fleet aircraft availabilities including redundancy and spares
This page was built for publication: Maximizing system availability through joint decision on component redundancy and spares inventory