A modified biogeography-based optimization for the flexible job shop scheduling problem

From MaRDI portal
Publication:1664896





Summary: The flexible job shop scheduling problem (FJSSP) is a practical extension of classical job shop scheduling problem that is known to be NP-hard. In this paper, an effective modified biogeography-based optimization (MBBO) algorithm with machine-based shifting is proposed to solve FJSSP with makespan minimization. The MBBO attaches great importance to the balance between exploration and exploitation. At the initialization stage, different strategies which correspond to two-vector representation are proposed to generate the initial habitats. At global phase, different migration and mutation operators are properly designed. At local phase, a machine-based shifting decoding strategy and a local search based on insertion to the habitat with best makespan are introduced to enhance the exploitation ability. A series of experiments on two well-known benchmark instances are performed. The comparisons between MBBO and other famous algorithms as well as BBO variants prove the effectiveness and efficiency of MBBO in solving FJSSP.











This page was built for publication: A modified biogeography-based optimization for the flexible job shop scheduling problem

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1664896)