A new energy-aware flexible job shop scheduling method using modified biogeography-based optimization
Summary: Industry consumes approximately half of the total worldwide energy usage. With the increasingly rising energy costs in recent years, it is critically important to consider one of the most widely used energies, electricity, during the production planning process. We propose a new mathematical model that can determine efficient scheduling to minimize the makespan and electricity consumption cost (ECC) for the flexible job shop scheduling problem (FJSSP) under a time-of-use (TOU) policy. In addition to the traditional two subtasks in FJSSP, a new subtask called speed selection, which represents the selection of variable operating speeds, is added. Then, a modified biogeography-based optimization (MBBO) algorithm combined with variable neighborhood search (VNS) is proposed to solve the biobjective problem. Experiments are performed to verify the effectiveness of the proposed MBBO algorithm for obtaining an improved scheduling solution compared to the basic biogeography-based optimization (BBO) algorithm, genetic algorithm (GA), and harmony search (HS).
- scientific article; zbMATH DE number 7070578
- Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization
- Flow shop scheduling under time-of-use electricity tariffs using fuzzy multi-objective linear programming approach
- A novel heuristic method for the energy-efficient flexible job-shop scheduling problem with sequence-dependent set-up and transportation time
- A modified biogeography-based optimization for the flexible job shop scheduling problem
- A Fast Taboo Search Algorithm for the Job Shop Problem
- An analysis of the equilibrium of migration models for biogeography-based optimization
- Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm
- Operational methods for minimization of energy consumption of manufacturing equipment
- Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
- Routing and scheduling in a flexible job shop by tabu search
- Variable neighborhood search
- A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost
- A modified biogeography-based optimization for the flexible job shop scheduling problem
- Multi-objective bi-level programming for the energy-aware integration of flexible job shop scheduling and multi-row layout
- Job shop scheduling with flexible energy prices and time windows
- Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing
- A study on PGEP to evolve heuristic rules for FJSSP considering the total cost of energy consumption and weighted tardiness
- A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: trade-off between production costs and energy consumption
- Energy-oriented scheduling based on evolutionary algorithms
- A bi-objective optimization model for integrated process planning and scheduling based on an improved algorithm
- Flexible production scheduling with volatile energy rates
- Flow shop scheduling under time-of-use electricity tariffs using fuzzy multi-objective linear programming approach
- Efficient approaches for solving a multiobjective energy-aware job shop scheduling problem
- scientific article; zbMATH DE number 7070578 (Why is no real title available?)
- A novel heuristic method for the energy-efficient flexible job-shop scheduling problem with sequence-dependent set-up and transportation time
- Energy cost efficient scheduling in flexible job-shop manufacturing systems
- A flexible job shop scheduling model for sustainable manufacturing
This page was built for publication: A new energy-aware flexible job shop scheduling method using modified biogeography-based optimization
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1993083)