Scheduling under fuzziness
From MaRDI portal
Publication:1968804
Cited in
(25)- Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
- scientific article; zbMATH DE number 5151383 (Why is no real title available?)
- Minimizing maximum cost for a single machine under uncertainty of processing times
- Three types of models for stochastic scheduling with fuzzy information
- Robust scheduling of parallel machines with sequence-dependent set-up costs
- Two scheduling problems with fuzzy due-dates
- A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions
- Fuzzy system models for aggregate scheduling analysis
- A possibilistic approach to sequencing problems with fuzzy parameters
- Fuzzy robust courses scheduling problem
- Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters.
- Measures of problem uncertainty for scheduling with interval processing times
- Project scheduling under uncertainty: survey and research potentials
- Genetic tabu search for the fuzzy flexible job shop problem
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
- Designing a multi-echelon closed-loop supply chain with disruption in the distribution centers under uncertainty
- Optimisation of fault-tolerant fabric-cutting schedules using genetic algorithms and fuzzy set theory
- scientific article; zbMATH DE number 1539057 (Why is no real title available?)
- Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach
- Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time
- Multi-objective genetic algorithm for single machine scheduling problem under fuzziness
- Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine
- Fuzzy job shop scheduling with lot-sizing
- Match-up scheduling of mixed-criticality jobs: maximizing the probability of jobs execution
- Fuzzy scheduling with application to real-time systems
This page was built for publication: Scheduling under fuzziness
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1968804)