Scheduling for multi-robot routing with blocking and enabling constraints
From MaRDI portal
Publication:2059084
Recommendations
Cites work
- A branch and bound algorithm for scheduling trains in a railway network
- A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
- A crane scheduling method for port container terminals
- A neighborhood for complex job shop scheduling problems with regular objectives
- A new neighborhood and tabu search for the blocking job shop
- A survey of berth allocation and quay crane scheduling problems in container terminals
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- A tabu search heuristic for the quay crane scheduling problem
- An Alternative Family of Transformations
- Approaches to modeling train scheduling problems as job-shop problems with blocking constraints
- Conflict-based search for optimal multi-agent pathfinding
- Efficient primal heuristic updates for the blocking job shop problem
- Enhancing stochastic search performance by value-biased randomization of heuristics
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Implementation of a linear time algorithm for certain generalized traveling salesman problems
- Job shop scheduling with setup times, deadlines and precedence constraints
- Job-shop scheduling with blocking and no-wait constraints
- New classes of efficiently solvable generalized traveling salesman problems
- Scheduling of dual-arm multi-tool assembly robots and workspace layout optimization
- Scheduling with AND/OR Precedence Constraints
- Template matching and decision diagrams for multi-agent path finding
- The late acceptance hill-climbing heuristic
- Two-Processor Scheduling with Start-Times and Deadlines
Cited in
(4)- Multi-robot systems scheduling under certainty constraints
- A constraint programming model for the scheduling and workspace layout design of a dual-arm multi-tool assembly robot
- A unified solution framework for flexible job shop scheduling problems with multiple resource constraints
- Spatio-temporal multi-robot routing
This page was built for publication: Scheduling for multi-robot routing with blocking and enabling constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2059084)