Scheduling of two-machine flowshop with outsourcing lead-time
From MaRDI portal
Publication:2147158
Recommendations
- Two-machine flow shop scheduling with limited cost of outsourcing
- Two-machine flow shop scheduling problem with an outsourcing option
- Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
- Outsourcing and scheduling for a two-machine flow shop with release times
- Two-machine open-shop scheduling with outsourcing
Cites work
- A comprehensive review and evaluation of permutation flowshop heuristics
- An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed
- Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed
- Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
- Outsourcing decisions in \(m\)-machine permutation flow shop scheduling problems with machine-dependent processing times
- Parallel-machine group scheduling with inclusive processing set restrictions, outsourcing option and serial-batching under the effect of step-deterioration
- Scheduling with an outsourcing option on both manufacturer and subcontractors
- Single machine scheduling problems with subcontracting options
- Single machine scheduling with outsourcing under different fill rates or quantity discount rates
- The Complexity of Flowshop and Jobshop Scheduling
- Two-machine flow shop scheduling problem with an outsourcing option
- Two-stage production scheduling with an outsourcing option
Cited in
(9)- Two-machine flow shop scheduling problem with an outsourcing option
- Outsourcing decisions in \(m\)-machine permutation flow shop scheduling problems with machine-dependent processing times
- Approximation algorithms for two-machine flow shop scheduling with an outsourcing option
- Outsourcing and scheduling for a two-machine flow shop with release times
- Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
- Two-machine flow shop scheduling with limited cost of outsourcing
- Coordinating scheduling and rejection decisions in a two-machine flow shop scheduling problem
- Due-date assignment with acceptable lead-times on parallel machines
- Minimizing the average tardiness: the case of outsource machines
This page was built for publication: Scheduling of two-machine flowshop with outsourcing lead-time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2147158)