An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
DOI10.1016/J.EJOR.2021.03.016zbMATH Open1487.90316OpenAlexW3135987480MaRDI QIDQ2239892FDOQ2239892
Filipe Rodrigues, Agostinho Agra
Publication date: 5 November 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2021.03.016
Recommendations
- A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
- Robust berth scheduling with uncertain vessel delay and handling time
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
- Robust berth scheduling at marine container terminals via hierarchical optimization
- Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
robust optimizationdecomposition algorithmOR in maritime industryberth allocation and quay crane schedulinguncertain arrival times
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Transportation, logistics and supply chain management (90B06)
Cites Work
- Title not available (Why is that?)
- The Price of Robustness
- Optimal berth allocation and time-invariant quay crane assignment in container terminals
- Berth management in container terminal: the template design problem
- Solving two-stage robust optimization problems using a column-and-constraint generation method
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- Tactical berth allocation under uncertainty
- Optimal policies for the berth allocation problem under stochastic nature
- Robust berth scheduling at marine container terminals via hierarchical optimization
- A sample average approximation approach to the berth allocation problem with uncertain tides
- A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
- Robust berth scheduling with uncertain vessel delay and handling time
- Robust cyclic berth planning of container vessels
- The robust vehicle routing problem with time windows
- Computing robust basestock levels
- K-Adaptability in Two-Stage Robust Binary Programming
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
- A MIP based local search heuristic for a stochastic maritime inventory routing problem
- Comparing techniques for modelling uncertainty in a maritime inventory routing problem
- A Decision Model for Berth Allocation Under Uncertainty Considering Service Level Using an Adaptive Differential Evolution Algorithm
Cited In (15)
- Robust optimization for a steel production planning problem with uncertain demand and product substitution
- Decomposition algorithms for the robust unidirectional quay crane scheduling problems
- Improved sequential insertion heuristics for berth allocation problems
- Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition
- A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
- Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model
- Robust berth scheduling with uncertain vessel delay and handling time
- The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion
- Robust scheduling for berth allocation and quay crane assignment problem
- Proactive berth scheduling with data-driven buffer time in container terminals
- Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey
- Simultaneous operation of next-generation and traditional quay cranes at container terminals
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions
- Integrated proactive-reactive approach and a hybrid adaptive large neighborhood search algorithm for berth and quay crane scheduling under uncertain combination
- Robust optimization for the integrated berth allocation and quay crane assignment problem
This page was built for publication: An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2239892)