An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
From MaRDI portal
Publication:2239892
DOI10.1016/j.ejor.2021.03.016zbMath1487.90316MaRDI QIDQ2239892
Filipe Rodrigues, Agostinho Agra
Publication date: 5 November 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2021.03.016
robust optimization; decomposition algorithm; OR in maritime industry; berth allocation and quay crane scheduling; uncertain arrival times
90B06: Transportation, logistics and supply chain management
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
Related Items
Simultaneous operation of next-generation and traditional quay cranes at container terminals, The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions, Robust optimization for the integrated berth allocation and quay crane assignment problem, Improved sequential insertion heuristics for berth allocation problems, Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition, Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model, Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey, Integrated proactive-reactive approach and a hybrid adaptive large neighborhood search algorithm for berth and quay crane scheduling under uncertain combination
Cites Work
- Unnamed Item
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- Tactical berth allocation under uncertainty
- Optimal policies for the berth allocation problem under stochastic nature
- Robust berth scheduling at marine container terminals via hierarchical optimization
- The robust vehicle routing problem with time windows
- A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
- Robust berth scheduling with uncertain vessel delay and handling time
- Computing robust basestock levels
- Robust cyclic berth planning of container vessels
- A MIP based local search heuristic for a stochastic maritime inventory routing problem
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
- Comparing techniques for modelling uncertainty in a maritime inventory routing problem
- Optimal berth allocation and time-invariant quay crane assignment in container terminals
- Berth management in container terminal: the template design problem
- Solving two-stage robust optimization problems using a column-and-constraint generation method
- A Decision Model for Berth Allocation Under Uncertainty Considering Service Level Using an Adaptive Differential Evolution Algorithm
- K-Adaptability in Two-Stage Robust Binary Programming
- The Price of Robustness
- A sample average approximation approach to the berth allocation problem with uncertain tides