Integrated machine scheduling and vehicle routing with time windows
From MaRDI portal
Publication:2253636
DOI10.1016/j.ejor.2012.11.049zbMath1292.90125OpenAlexW2056922736MaRDI QIDQ2253636
Publication date: 27 July 2014
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2012.11.049
Related Items (33)
Integrated production and outbound distribution scheduling problems with job release dates and deadlines ⋮ Approximation algorithms for the single-machine scheduling with a period of maintenance ⋮ Integrated production and multiple trips vehicle routing with time windows and uncertain travel times ⋮ A multi-objective and integrated model for supply chain scheduling optimization in a multi-site manufacturing system ⋮ On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: minimizing the makespan and delivery cost ⋮ Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation ⋮ The fish feed production routing problem ⋮ Continuous-time production, distribution and financial planning with periodic liquidity balancing ⋮ Parallel machine scheduling with batch delivery to two customers ⋮ Integrated production-distribution scheduling problem with multiple independent manufacturers ⋮ Integrated production and transportation scheduling with order-dependent inventory holding costs ⋮ Same‐day deliveries in omnichannel retail: Integrated order picking and vehicle routing with vehicle‐site dependencies ⋮ Integrating production scheduling and transportation procurement through combinatorial auctions ⋮ An improved memetic algorithm for integrated production scheduling and vehicle routing decisions ⋮ Order picking with multiple pickers and due dates -- simultaneous solution of order batching, batch assignment and sequencing, and picker routing problems ⋮ A review on integrated scheduling and outbound vehicle routing problems ⋮ A decentralized production–distribution scheduling problem: Solution and analysis ⋮ Integrated order acceptance and scheduling decision making in product service supply chain with hard time windows constraints ⋮ Vehicle routing problems with multiple trips ⋮ A framing link based tabu search algorithm for large-scale multidepot vehicle routing problems ⋮ A P-based hybrid evolutionary algorithm for vehicle routing problem with time windows ⋮ The Vehicle Routing Problem with Release and Due Dates ⋮ Scheduling in a two-stage supply chain with uncertain parameters ⋮ Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms ⋮ Multimodal processes prototyping subject to grid-like network and fuzzy operation time constraints ⋮ Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs ⋮ Integrated order batching and vehicle routing operations in grocery retail -- a general adaptive large neighborhood search algorithm ⋮ Vehicle routing problems with multiple trips ⋮ A Benders decomposition-based heuristic for a production and outbound distribution scheduling problem with strict delivery constraints ⋮ Two parallel machines scheduling with two-vehicle job delivery to minimize makespan ⋮ Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design ⋮ The mobile production vehicle routing problem: using 3D printing in last mile distribution ⋮ New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance
This page was built for publication: Integrated machine scheduling and vehicle routing with time windows