Dispatch planning using newsvendor dual problems and occupation times: application to hydropower
DOI10.1016/j.ejor.2013.01.033zbMath1317.90137OpenAlexW2046972278MaRDI QIDQ2355074
Publication date: 28 July 2015
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2013.01.033
bang-bang controloccupation timenewsvendor problemmultistage stochastic linear programminghydropower optimizationdispatch planning
Linear programming (90C05) Stochastic programming (90C15) Production models (90B30) Stochastic scheduling theory in operations research (90B36) Case-oriented studies in operations research (90B90)
Related Items
Uses Software
Cites Work
- Optimal electricity generation portfolios. The impact of price spread modelling
- Multistage stochastic portfolio optimisation in deregulated electricity markets using linear decision rules
- The newsvendor problem: review and directions for future research
- Risk management of power portfolios and valuation of flexibility
- Convergent bounds for stochastic programs with expected value constraints
- Multi-stage stochastic optimization applied to energy planning
- Mixing: Properties and examples
- Scenario simulation: Theory and methodology
- Multi-stage newsboy problem: A dynamic model.
- Optimal procurement strategies for online spot markets.
- An enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling
- A stochastic model for the daily coordination of pumped storage hydro plants and wind power plants
- Dual sourcing using capacity reservation and spot market: optimal procurement policy and heuristic parameter determination
- Short-term hydropower production planning by stochastic programming
- Coherent multiperiod risk adjusted values and Bellman's principle
- Measuring risk for income streams
- Optimal Energy Commitments with Storage and Intermittent Supply
- Hybrid Bottom-Up/Top-Down Modeling of Prices in Deregulated Wholesale Power Markets
- Stochastic Optimization of Electricity Portfolios: Scenario Tree Modeling and Risk Management
- An algorithm for bang–bang control of fixed-head hydroplants
- TIME OPTIMAL CONTROL SYSTEMS
- Introduction to Stochastic Programming
- Linear Programming
- A Decision Support Model for Weekly Operation of Hydrothermal Systems by Stochastic Nonlinear Optimization
- Scenarios for multistage stochastic programs
- Measure and integration theory. Transl. from the German by Robert B. Burckel
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Dispatch planning using newsvendor dual problems and occupation times: application to hydropower