Rescheduling optimization of steelmaking-continuous casting process based on the Lagrangian heuristic algorithm
DOI10.3934/jimo.2016081zbMath1365.90129OpenAlexW2530819940MaRDI QIDQ2397581
Fangjun Luan, Yu Ying, Kun Mao, Liang-Liang Sun
Publication date: 22 May 2017
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2016081
dynamic programmingsteelmaking-continuous castingsubgradient algorithmreschedulingLagrangian heuristic algorithm
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Dynamic programming (90C39)
Related Items (1)
Cites Work
- A novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting process
- Lagrangian relaxation with cut generation for hybrid flowshop scheduling problems to minimize the total weighted tardiness
- Scheduling a hybrid flowshop with batch production at the last stage
- A novel hybrid algorithm for scheduling steel-making continuous casting production
- Conditional subgradient optimization -- theory and applications
- Convergence of a simple subgradient level method
- An alternative framework to Lagrangian relaxation approach for job shop scheduling.
- Executing production schedules in the face of uncertainties: a review and some future directions
- A variable target value method for nondifferentiable optimization
- A survey of dynamic scheduling in manufacturing systems
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Incremental Subgradient Methods for Nondifferentiable Optimization
- Integrated Charge Batching and Casting Width Selection at Baosteel
- A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry
- Steel-making process scheduling using Lagrangian relaxation
- A review of planning and scheduling systems and methods for integrated steel production
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Rescheduling optimization of steelmaking-continuous casting process based on the Lagrangian heuristic algorithm