Scheduling workover rigs for onshore oil production
From MaRDI portal
Publication:2489895
Recommendations
- Models and hybrid methods for the onshore wells maintenance problem
- A branch-price-and-cut algorithm for the workover rig routing problem
- A comparison of three metaheuristics for the workover rig routing problem
- Scheduling pumpoff operations in onshore oilfields with electric-power constraints and variable cycle time
- Scheduling activities at oil wells with resource displacement
Cites work
Cited in
(11)- A hybrid algorithm for the drilling rig routing problem
- Strategic oscillation for the balanced minimum sum-of-squares clustering problem
- Variable neighbourhood search: Methods and applications
- Variable neighbourhood search: methods and applications
- Vehicle routing with endogenous learning: application to offshore plug and abandonment campaign planning
- Scheduling pumpoff operations in onshore oilfields under electric-power constraints
- A branch-price-and-cut algorithm for the workover rig routing problem
- Scheduling pumpoff operations in onshore oilfields with electric-power constraints and variable cycle time
- Models and hybrid methods for the onshore wells maintenance problem
- Branch-and-price-and-cut for the multiple traveling repairman problem with distance constraints
- A comparison of three metaheuristics for the workover rig routing problem
This page was built for publication: Scheduling workover rigs for onshore oil production
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2489895)