Modelling and analysis of a multi-stage system involving batch processors with incompatible job families
Summary: Batch processors can concurrently process more than one job, and are commonly used in complex manufacturing systems such as wafer fabrication facilities (wafer fabs). Previous work has shown that there can be a significant reduction in cycle time when the control of the upstream serial processor is dependent on the batch processor. We wish to determine whether this is also true when the upstream processor is also a batch processor, with smaller capacity. We model a two-stage system with an upstream batch processor and a downstream batch processor under differing simple control policies as a continuous time-discrete state Markov chain. In doing so, we show that the concept of constraining the production of the upstream processor in accordance to the anticipated needs of the downstream batch processor can similarly reduce mean system cycle time when the upstream processor is a smaller batch processor. We also perform simulation experiments, using parameters close to those found in wafer fabs, and confirm that the strategy of prioritising the formation of larger batches for the downstream batch processor typically results in substantial cycle time reductions for the two-stage system.
- Scheduling batch processing machines with incompatible job families
- Stochastic scheduling of a batch processing machine with incompatible job families
- scientific article; zbMATH DE number 1783881
- Scheduling parallel batch processing machines with arbitrary job sizes and incompatible job families
- Minimizing number of tardy jobs on a batch processing machine with incompatible job families
- scientific article; zbMATH DE number 1728441
- Assignment and sequencing models for the scheduling of process systems
- Analysis of job assignment with batch arrivals among heterogeneous servers
- Evaluating the performance of look-ahead policies for upstream serial processor with downstream batch processor serving incompatible job families and finite buffer sizes
- Optimal batching in a wafer fabrication facility using a multiproduct G/G/c model with batch processing
- Controlling job arrivals with processing time windows into batch processor buffer
This page was built for publication: Modelling and analysis of a multi-stage system involving batch processors with incompatible job families
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2627422)