Discussion: Sequencing n Jobs on Two Machines with Arbitrary Time Lags
From MaRDI portal
Publication:2778608
DOI10.1287/mnsc.5.3.299zbMath0995.90537MaRDI QIDQ2778608
Publication date: 22 October 2002
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.5.3.299
Related Items
An empirical analysis of the optimality rate of flow shop heuristics, Non-bottleneck machines in three-machine flow shops, Lot streaming in the two-machine flow shop with setup times, The master-slave paradigm in parallel computer and industrial settings, Two- and three-machine flow shop scheduling problems with equal sized transfer batches