Non-bottleneck machines in three-machine flow shops
From MaRDI portal
Publication:1585915
DOI10.1002/1099-1425(200007/08)3:4%3C209::AID-JOS43%3E3.0.CO;2-WzbMATH Open0962.90017MaRDI QIDQ1585915FDOQ1585915
Authors: Jerzy Kamburowski
Publication date: 3 January 2001
Published in: Journal of Scheduling (Search for Journal in Brave)
Recommendations
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Optimal two- and three-stage production schedules with set-up time included
- The Complexity of Flowshop and Jobshop Scheduling
- Mean Flow Time Minimization in Reentrant Job Shops with a Hub
- Flowshop scheduling with dominant machines
- A concise survey of efficiently solvable special cases of the permutation flow-shop problem
- A New Heuristic for Three-Machine Flow Shop Scheduling
- Flow-shops with a dominant machine
- Sequencing with Series-Parallel Precedence Constraints
- Shop Problems With Two Machines and Time Lags
- Mathematical aspects of the 3 × n job-shop sequencing problem
- Worst-case analysis of Dannenbring's algorithm for flow-shop scheduling
- The Two-Machine Maximum Flow Time Problem with Series Parallel Precedence Relations
- A Note on Heuristics of Flow-Shop Scheduling
- Discussion: sequencing \(n\) jobs on two machines with arbitrary time lags
- Technical Note—Three-Stage Flow-Shops with Recessive Second Stage
- Technical Note—Johnson's Three-Machine Flow-Shop Conjecture
- Counterexamples to optimal permutation schedules for certain flow shop problems
- A special case of the 3 ×n flow shop problem
- A note on a paper by W. Szwarc
Cited In (3)
This page was built for publication: Non-bottleneck machines in three-machine flow shops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1585915)