The Two-Machine Maximum Flow Time Problem with Series Parallel Precedence Relations
From MaRDI portal
Publication:3863680
DOI10.1287/opre.27.4.782zbMath0426.90047OpenAlexW2073284889MaRDI QIDQ3863680
Publication date: 1979
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.27.4.782
minimization of makespantwo-machine maximum flow time problempolynomial bounded optimal algorithmseries parallel precedence relations
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Related Items
A compact labelling scheme for series-parallel graphs, The two-machine flow shop problem with arbitrary precedence relations, Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches, Sequencing with general precedence constraints, Job lateness in a two-machine flowshop with setup times separated, A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations, Minimizing the makespan in a two-machine cross-docking flow shop problem, Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times, A decomposition theory based on a dominance relation and composite jobs, The most likely path on series-parallel networks, Reduction of job-shop problems to flow-shop problems with precedence constraints, Scheduling Opposing Forests, Non-bottleneck machines in three-machine flow shops, Algorithms for two-machine flow-shop sequencing with precedence constraints