Algorithms for two-machine flow-shop sequencing with precedence constraints
DOI10.1016/0377-2217(84)90238-8zbMATH Open0551.90041OpenAlexW2083877644MaRDI QIDQ800822FDOQ800822
Authors: A. M. A. Hariri, Chris N. Potts
Publication date: 1984
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(84)90238-8
Recommendations
- The two-machine flow shop problem with arbitrary precedence relations
- The two-machine flowshop total completion time problem: improved lower bounds and a branch-and-bound algorithm
- The three-machine flow-shop problem with arbitrary precedence relations
- Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation
- Flow shop scheduling problems under machine-dependent precedence constraints
branch-and-bound algorithmprecedence constraintsLagrangean relaxationtwo-machine flow-shoplower bounding ruleminimizing the maximum completion time
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Optimal two- and three-stage production schedules with set-up time included
- A General Bounding Scheme for the Permutation Flow-Shop Problem
- A branch and bound algorithm for the two-stage assembly scheduling problem
- An adaptive branching rule for the permutation flow-shop problem
- Sequencing to Minimize the Maximum Job Cost
- Sequencing \(n\) jobs on two machines with arbitrary time lags
- Scheduling two job classes on a single machine
- The Two-Machine Maximum Flow Time Problem with Series-Parallel Precedence Constraints: An Algorithm and Extensions
- The Two-Machine Maximum Flow Time Problem with Series Parallel Precedence Relations
- TWO-MACHINE SCHEDULING UNDER REQUIRED PRECEDENCE AMONG JOBS
- TWO-MACHINE SCHEDULING UNDER ARBITRARY PRECEDENCE CONSTRAINTS
Cited In (9)
- A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations
- Certain exact and approximate algorithms for solving precedence problems with constraints
- A two-machine flowshop scheduling problem with precedence constraint on two jobs
- Cellular control of manufacturing systems
- Flow shop scheduling problems under machine-dependent precedence constraints
- An exact algorithm for the batch sequencing problem in a two-machine flow shop with limited buffer
- The three-machine flow-shop problem with arbitrary precedence relations
- Two-machine no-wait flow shop scheduling problem with precedence constraints
- The two-machine flow shop problem with arbitrary precedence relations
Uses Software
This page was built for publication: Algorithms for two-machine flow-shop sequencing with precedence constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q800822)