Machine scheduling in underground mining: an application in the potash industry
From MaRDI portal
(Redirected from Publication:280169)
Recommendations
- Staff and machine shift scheduling in a German potash mine
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers
- Underground mine scheduling of mobile machines using constraint programming and large neighborhood search
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines
- Optimization-based heuristics for underground mine scheduling
Cites work
- scientific article; zbMATH DE number 2130220 (Why is no real title available?)
- A Survey of Scheduling Rules
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
- A shortest-path algorithm for solving the fleet management problem in underground mines
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- A survey of priority rule-based scheduling
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
- Algorithms for Solving Production-Scheduling Problems
- An enumeration algorithm for solving the fleet management problem in underground mines
- An integrated approach for modeling and solving the scheduling problem of container handling systems
- Bounding strategies for the hybrid flow shop scheduling problem
- Global lower bounds for flow shops with multiple processors
- Handbook of operations research in natural resources. With the collaboration of Jaime Miranda
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
- Modeling realistic hybrid flexible flowshop scheduling problems
- Optimization-based heuristics for underground mine scheduling
- Optimizing long-term production plans in underground and open-pit copper mines
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Scheduling
- Sequencing of jobs in some production system
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- The hybrid flow shop scheduling problem
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Using aggregation to optimize long-term production planning at an underground mine
Cited in
(7)- Editorial ``Project management and scheduling
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers
- A real-world mine excavators timetabling methodology in open-pit mining
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines
- Short-term scheduling of production fleets in underground mines using CP-based LNS
- Underground mine scheduling of mobile machines using constraint programming and large neighborhood search
- Staff and machine shift scheduling in a German potash mine
This page was built for publication: Machine scheduling in underground mining: an application in the potash industry
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q280169)