The Exact Run Length Distribution and Design of the Shewhart Chart with Estimated Parameters Based on Median Run Length
DOI10.1080/03610918.2014.889158zbMath1383.62353OpenAlexW2030529491MaRDI QIDQ2816741
Michael B. C. Khoo, Philippe Castagliola, Ming Ha Lee, W. L. Teoh
Publication date: 25 August 2016
Published in: Communications in Statistics - Simulation and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610918.2014.889158
statistical process controlestimated parametersrun length distributionaverage run lengthdesign modelmedian run lengthShewhart \(\overline{X}\) chart
Applications of statistics in engineering and industry; control charts (62P30) Exact distribution theory in statistics (62E15)
Related Items (3)
Cites Work
- False Signal Rates for the (X) Control Charts with Runs Tests When Process Parameters Are Estimated
- Combined Shewhart–EWMA control charts with estimated parameters
- Parameter estimation and design considerations in prospective applications of theX¯ chart
- An optimal design of ewma control charts based on median run length
- Joint Monitoring of the Mean and Variance of Combined Control Charts with Estimated Parameters
- Unnamed Item
- Unnamed Item
This page was built for publication: The Exact Run Length Distribution and Design of the Shewhart Chart with Estimated Parameters Based on Median Run Length