Public transit planning and scheduling based on AVL data in China
DOI10.1111/ITOR.12164zbMATH Open1348.90310OpenAlexW1995957707MaRDI QIDQ2829158FDOQ2829158
Yindong Shen, Zhongyi Zeng, Jia Xu
Publication date: 27 October 2016
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/itor.12164
Recommendations
Deterministic scheduling theory in operations research (90B35) Economic models of real-world systems (e.g., electricity markets, etc.) (91B74) Traffic problems in operations research (90B20)
Cites Work
- Staff scheduling and rostering: a review of applications, methods and models.
- Multi-depot vehicle scheduling problems with time windows and waiting costs
- A decomposition approach for the integrated vehicle-crew-roster problem with days-off pattern
- Transit Network Re-timetabling and Vehicle Scheduling
- A time-space network based exact optimization model for multi-depot bus scheduling
- On some matching problems arising in vehicle scheduling models
- Divide-and-price: a decomposition algorithm for solving large railway crew scheduling problems
- An approach for solving a class of transportation scheduling problems
- Approximations and bounds for the variance of steady-state waiting times in a GI/G/1 queue
- Integrated bus transit scheduling for the Beijing bus group based on a unified mode of operation
Cited In (4)
- Scheduling the vehicles of bus rapid transit systems: a case study
- Title not available (Why is that?)
- Solving a real constraint satisfaction model for the university course timetabling problem: a case study
- Integrated bus transit scheduling for the Beijing bus group based on a unified mode of operation
This page was built for publication: Public transit planning and scheduling based on AVL data in China
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2829158)