Dismantle or remanufacture?
From MaRDI portal
Publication:296990
DOI10.1016/j.ejor.2013.09.042zbMath1339.90052OpenAlexW1980251970MaRDI QIDQ296990
Goker Aydin, Souza, Gilvan C., Shan-Shan Guo
Publication date: 24 June 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2013.09.042
Stochastic programming (90C15) Management decision making, including multiple objectives (90B50) Transportation, logistics and supply chain management (90B06) Inventory, storage, reservoirs (90B05) Dynamic programming (90C39)
Related Items (6)
Optimisation of integrated reverse logistics networks with different product recovery routes ⋮ Bricks vs. clicks: which is better for marketing remanufactured products? ⋮ Policies for inventory models with product returns forecast from past demands and past sales ⋮ The role of part failure rates asymmetry and spare part proprietariness on remanufacturing decision making ⋮ Production planning in a three-stock reverse-logistics system with deteriorating items under a periodic review policy ⋮ Design of a multi echelon product recovery embeded reverse logistics network for multi products and multi periods
Cites Work
- Integrated planning of acquisition, disassembly and bulk recycling: a case study on electronic scrap recovery
- On a medium term product recovery and disposal strategy for durable assembly products
- Model for the allocation of electronics components to reuse options
- Product recovery in stochastic remanufacturing systems with multiple reuse options
This page was built for publication: Dismantle or remanufacture?